Mostra el registre d'ítem simple

dc.contributor.authorDelgado Muñoz, Luis
dc.contributor.authorPrats Menéndez, Xavier
dc.contributor.otherEscola d'Enginyeria de Telecomunicació i Aeroespacial de Castelldefels
dc.date.accessioned2015-05-30T10:47:18Z
dc.date.available2015-09-25T00:30:35Z
dc.date.created2014-11-01
dc.date.issued2014-11-01
dc.identifier.citationDelgado, L.; Prats, X. Operating cost based cruise speed reduction for ground delay programs: Effect of scope length. "Transportation research. Part C, emerging technologies", 01 Novembre 2014, vol. 48, p. 437-452.
dc.identifier.issn0968-090X
dc.identifier.urihttp://hdl.handle.net/2117/28107
dc.description.abstractGround delay programs typically involve the delaying of aircraft that are departing from origin airports within some set distance of a capacity constrained destination airport. Long haul flights are not delayed in this way. A trade-off exists when fixing the distance parameter: increasing the 'scope' distributes delay among more aircraft and may reduce airborne holding delay but could also result in unnecessary delay in the (frequently observed) case of early program cancellation. In order to overcome part of this drawback, a fuel based cruise speed reduction strategy aimed at realizing airborne delay, was suggested by the authors in previous publications. By flying slower, at a specific speed, aircraft that are airborne can recover part of their initially assigned delay without incurring extra fuel consumption if the ground delay program is canceled before planned. In this paper, the effect of the scope of the program is assessed when applying this strategy. A case study is presented by analyzing all the ground delay programs that took place at San Francisco, Newark Liberty and Chicago O'Hare International airports during one year. Results show that by the introduction of this technique it is possible to define larger scopes, partially reducing the amount of unrecovered delay. (C) 2014 Elsevier Ltd. All rights reserved.
dc.format.extent16 p.
dc.language.isoeng
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 Spain
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/es/
dc.subjectÀrees temàtiques de la UPC::Aeronàutica i espai
dc.subject.lcshAirplanes--Speed
dc.subject.lcshAvions -- Velocitat
dc.subject.otherGround delay program
dc.subject.otherSpeed reduction
dc.subject.otherGround delay program scope
dc.subject.otherDelay savings
dc.subject.otherAirborne delay
dc.subject.otherTRAFFIC FLOW MANAGEMENT
dc.titleOperating cost based cruise speed reduction for ground delay programs: Effect of scope length
dc.typeArticle
dc.subject.lemacTrànsit aèri -- Control
dc.contributor.groupUniversitat Politècnica de Catalunya. ICARUS - Intelligent Communications and Avionics for Robust Unmanned Aerial Systems
dc.identifier.doi10.1016/j.trc.2014.09.015
dc.description.peerreviewedPeer Reviewed
dc.rights.accessOpen Access
local.identifier.drac15259365
dc.description.versionPostprint (published version)
local.citation.authorDelgado, L.; Prats, X.
local.citation.publicationNameTransportation research. Part C, emerging technologies
local.citation.volume48
local.citation.startingPage437
local.citation.endingPage452


Fitxers d'aquest items

Thumbnail

Aquest ítem apareix a les col·leccions següents

Mostra el registre d'ítem simple