Mostra el registre d'ítem simple

dc.contributor.authorMateo Doll, Manuel
dc.contributor.authorCompanys Pascual, Ramón
dc.contributor.otherUniversitat Politècnica de Catalunya. Departament d'Organització d'Empreses
dc.date.accessioned2012-07-31T11:02:12Z
dc.date.available2012-07-31T11:02:12Z
dc.date.created2012-07-27
dc.date.issued2012-07-27
dc.identifier.citationMateo, M.; Companys, R. "n-Cyclic Hoist Scheduling Problem to manufacture more than 2 products". 2012.
dc.identifier.urihttp://hdl.handle.net/2117/16384
dc.description.abstractJobs of more than two products (n>2) must be manufactured in a production line of tanks. A hoist transports the jobs between tanks. If the size of both batches is equal and the number of jobs is high, a cyclic scheduling can be proposed. The problem consists in the scheduling of hoist movements, which is known as CHSP (Cyclic Hoist Scheduling Problem). The objective is double: first, determine a sequence of the n products in a job cycle and then minimise the cycle time for the given sequence of products (n-cycle). We propose the use of a branch-and-bound procedure previously developed, which was developed for the 2-cycle. As there are different sequences of products, the experience demonstrates that the use of upper bounds as a result of previous steps in the algorithms generally leads to the optimum solution in lower times.
dc.format.extent39 p.
dc.language.isoeng
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 Spain
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/es/
dc.subjectÀrees temàtiques de la UPC::Economia i organització d'empreses
dc.subject.lcshScheduling
dc.subject.lcshAssembly-line methods
dc.titlen-Cyclic Hoist Scheduling Problem to manufacture more than 2 products
dc.typeExternal research report
dc.subject.lemacProducció -- Planificació
dc.contributor.groupUniversitat Politècnica de Catalunya. EOLI - Enginyeria d'Organització i Logística Industrial
dc.rights.accessOpen Access
local.identifier.drac10771167
dc.description.versionPreprint
local.citation.authorMateo, M.; Companys, R.
local.citation.publicationNamen-Cyclic Hoist Scheduling Problem to manufacture more than 2 products


Fitxers d'aquest items

Thumbnail

Aquest ítem apareix a les col·leccions següents

Mostra el registre d'ítem simple