n-Cyclic Hoist Scheduling Problem to manufacture more than 2 products
dc.contributor.author | Mateo Doll, Manuel |
dc.contributor.author | Companys Pascual, Ramón |
dc.contributor.other | Universitat Politècnica de Catalunya. Departament d'Organització d'Empreses |
dc.date.accessioned | 2012-07-31T11:02:12Z |
dc.date.available | 2012-07-31T11:02:12Z |
dc.date.created | 2012-07-27 |
dc.date.issued | 2012-07-27 |
dc.identifier.citation | Mateo, M.; Companys, R. "n-Cyclic Hoist Scheduling Problem to manufacture more than 2 products". 2012. |
dc.identifier.uri | http://hdl.handle.net/2117/16384 |
dc.description.abstract | Jobs of more than two products (n>2) must be manufactured in a production line of tanks. A hoist transports the jobs between tanks. If the size of both batches is equal and the number of jobs is high, a cyclic scheduling can be proposed. The problem consists in the scheduling of hoist movements, which is known as CHSP (Cyclic Hoist Scheduling Problem). The objective is double: first, determine a sequence of the n products in a job cycle and then minimise the cycle time for the given sequence of products (n-cycle). We propose the use of a branch-and-bound procedure previously developed, which was developed for the 2-cycle. As there are different sequences of products, the experience demonstrates that the use of upper bounds as a result of previous steps in the algorithms generally leads to the optimum solution in lower times. |
dc.format.extent | 39 p. |
dc.language.iso | eng |
dc.rights | Attribution-NonCommercial-NoDerivs 3.0 Spain |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/es/ |
dc.subject | Àrees temàtiques de la UPC::Economia i organització d'empreses |
dc.subject.lcsh | Scheduling |
dc.subject.lcsh | Assembly-line methods |
dc.title | n-Cyclic Hoist Scheduling Problem to manufacture more than 2 products |
dc.type | External research report |
dc.subject.lemac | Producció -- Planificació |
dc.contributor.group | Universitat Politècnica de Catalunya. EOLI - Enginyeria d'Organització i Logística Industrial |
dc.rights.access | Open Access |
local.identifier.drac | 10771167 |
dc.description.version | Preprint |
local.citation.author | Mateo, M.; Companys, R. |
local.citation.publicationName | n-Cyclic Hoist Scheduling Problem to manufacture more than 2 products |