The multi-objective assembly line worker integration and balancing problem of type-2
Visualitza/Obre
Cita com:
hdl:2117/101447
Tipus de documentArticle
Data publicació2017-06-01
Condicions d'accésAccés obert
Llevat que s'hi indiqui el contrari, els
continguts d'aquesta obra estan subjectes a la llicència de Creative Commons
:
Reconeixement-NoComercial-SenseObraDerivada 3.0 Espanya
Abstract
The consideration of worker heterogeneity in assembly lines has received a fair amount of attention in the literature in the past decade. Most of this exploration uses as motivation the example of assembly lines in sheltered work centers for the disabled. Only recently has the community started looking at the situation faced in assembly lines in the general industrial park, when in the presence of worker heterogeneity. This step raises a number of questions around the best way to incorporate heterogeneous workers in the line, maximizing their integration while maintaining productivity levels. In this paper we propose the use of Miltenburg’s regularity criterion and cycle time as metrics for integration of workers and productivity, respectively. We then define, model and develop heuristics for a line balancing problem with these two goals. Results obtained through an extensive set of computational experiments indicate that a good planning can obtain trade-off solutions that perform well in both objectives.
CitacióMoreira, M., Pastor, Rafael, Costa, A. E., Miralles, C. The multi-objective assembly line worker integration and balancing problem of type-2. "Computers & operations research", 1 Juny 2017, vol. 82, p. 114-125.
ISSN0305-0548
Versió de l'editorhttp://www.sciencedirect.com/science/article/pii/S0305054817300059
Fitxers | Descripció | Mida | Format | Visualitza |
---|---|---|---|---|
multi_alwibp2_revised.pdf | 368,2Kb | Visualitza/Obre |