Mostra el registre d'ítem simple

dc.contributor.authorMohanty, Ashok
dc.contributor.authorMishra, Jibitesh
dc.contributor.authorSatpathy, Biswajit
dc.date.accessioned2012-05-21T15:27:00Z
dc.date.available2012-05-21T15:27:00Z
dc.date.issued2011-12
dc.identifier.citationMohanty, Ashok; Mishra, Jibitesh; Satpathy, Biswajit. Activity modes selection for project crashing through deterministic simulation. "Journal of Industrial Engineering and Management", Desembre 2011, vol. 4, núm. 4, p. 610-623.
dc.identifier.issn2013-0953
dc.identifier.urihttp://hdl.handle.net/2099/12217
dc.description.abstractPurpose: The time-cost trade-off problem addressed by CPM-based analytical approaches, assume unlimited resources and the existence of a continuous time-cost function. However, given the discrete nature of most resources, the activities can often be crashed only stepwise. Activity crashing for discrete time-cost function is also known as the activity modes selection problem in the project management. This problem is known to be NP-hard. Sophisticated optimization techniques such as Dynamic Programming, Integer Programming, Genetic Algorithm, Ant Colony Optimization have been used for finding efficient solution to activity modes selection problem. The paper presents a simple method that can provide efficient solution to activity modes selection problem for project crashing. Design/methodology/approach: Simulation based method implemented on electronic spreadsheet to determine activity modes for project crashing. The method is illustrated with the help of an example. Findings: The paper shows that a simple approach based on simple heuristic and deterministic simulation can give good result comparable to sophisticated optimization techniques. Research limitations/implications: The simulation based crashing method presented in this paper is developed to return satisfactory solutions but not necessarily an optimal solution. Practical implications: The use of spreadsheets for solving the Management Science and Operations Research problems make the techniques more accessible to practitioners. Spreadsheets provide a natural interface for model building, are easy to use in terms of inputs, solutions and report generation, and allow users to perform what-if analysis. Originality/value: The paper presents the application of simulation implemented on a spreadsheet to determine efficient solution to discrete time cost tradeoff problem.
dc.format.extent14 p.
dc.language.isoeng
dc.publisherSchool of Industrial and Aeronautic Engineering of Terrassa (ETSEIAT). Universitat Politècnica de Catalunya (UPC)
dc.rightsAttribution-NonCommercial 3.0 Spain
dc.rights.urihttp://creativecommons.org/licenses/by-nc/3.0/es/
dc.subjectÀrees temàtiques de la UPC::Economia i organització d'empreses::Direcció d'operacions
dc.subjectÀrees temàtiques de la UPC::Matemàtiques i estadística::Investigació operativa
dc.subject.lcshProject management--Computer programs
dc.subject.lcshSimulation methods
dc.subject.otherActivity crashing
dc.subject.otherCPM
dc.subject.otherOtimization
dc.titleActivity modes selection for project crashing through deterministic simulation
dc.typeArticle
dc.subject.lemacGestió de projectes -- Programes d'ordinador
dc.subject.lemacSimulació, Mètodes de
dc.identifier.dlB-28744-2008
dc.description.peerreviewedPeer Reviewed
dc.rights.accessOpen Access
local.citation.authorMohanty, Ashok; Mishra, Jibitesh; Satpathy, Biswajit
local.citation.publicationNameJournal of Industrial Engineering and Management
local.citation.volume4
local.citation.number4
local.citation.startingPage610
local.citation.endingPage623


Fitxers d'aquest items

Thumbnail

Aquest ítem apareix a les col·leccions següents

Mostra el registre d'ítem simple