Mostra el registre d'ítem simple

dc.contributorFernández García-Escudero, Luis
dc.contributor.authorRibera Martínez, Marc
dc.contributor.otherUniversitat Politècnica de Catalunya. Departament de Construccions Arquitectòniques II
dc.coverage.spatialeast=2.828684449195862; north=41.97880626733864; name=17004 Girona, Espanya
dc.date.accessioned2015-02-24T09:55:52Z
dc.date.available2015-02-24T09:55:52Z
dc.date.issued2014-10
dc.identifier.urihttp://hdl.handle.net/2099.1/25293
dc.description.abstract[CASTELLÀ] El presente proyecto consiste en el desarrollo de un proyecto ejecutivo de las instalaciones de un hotel **** en Girona, con el objetivo de dotar al edificio de las instalaciones siguientes: Instalación de Fontanería, Instalación de Energía Solar, Instalación de Evacuación, Instalación de Climatización, Instalación de Ventilación, Instalación de Electricidad, Instalación de Iluminación, Instalación de Telecomunicaciones, Instalación de Gas y Instalación Contraincendios. Con el fin de respetar el medioambiente se utlizarán energías renovables, como son la instalación de placas solares, para reducir el consumo de la energía, el aprovechamiento de las aguas pluviales para ahorrar en el consumo del agua, reductores de caudal y la iluminación de bajo consumo. El hotel tiene 4 plantas y su geometría es en forma de U, dividiéndolo en tres partes, el módulo central, el módulo norte y el módulo sur, en la planta sótano se encuentra el garaje del hotel, en la planta baja hay la zona de hostelería con dos comedores, la cocina y los servicios del hotel como son los vestuarios de personal, el comedor de personal, la lavendería y lencería, los baños y la sala de máquinas, en la siguiente planta, la planta primera está el hall de entrada al hotel, las oficinas, tres salas polivalentes y 24 habitaciones mas un oficio de planta por cada módulo del hotel y en la planta segunda hay 34 habitaciones mas un oficio de planta por cada módulo del hotel. Para la elaboración del proyecto se han tenido en cuenta las normativas vigentes, tanto el Código Técnico de la Edificación, el Reglamento de Instalaciones Térmicas de los Edificios, el Reglamento Electrotécnico para Baja Tensión, como las ordenanzas metropolitanas y municipales de Girona, entre otras. El Proyecto consta de 5 partes: - Memoria descriptiva de cada instalación - Anejos de cálculo - Pliego de condiciones - Presupuesto de las instalaciones - Planos y detalles de las instalaciones [ANGLÈS] The present work involves the development of a four star hotel executive project in Girona, in order to provide the building with the following facilities: Water Installation, Solar Energy Installation, Evacuation Installation, Air Conditioning Installation, Ventilation Installation, Electrical Installation, Lighting Installation, Telecommunications Installation, Gas Installation and Fire protection Installation. With the aim to respect the environment, Renewable energy will be used, such as, using solar panels systems to reduce energy consumption, the rainwater to save on water consumption, flow restrictors or low-energy lighting, inter alia. The hotel, wich has 4 floors and its geometry is U-shaped, is divided into three parts, the central module, the northern module and southern module. In the basement floor is located the parking Hotel, in the ground floor the restaurant area with two dining rooms, the kitchen and Hotel facilities, such as, changing rooms, the dining room staff, lavenderia and lingerie, the bathrooms and the engine room. In the next floor, the first floor, is located the entrance hall hotel, the offices, three multipurpose rooms and 24 bedrooms and a office floor in each hotel module. And finally, on the second floor there are 34 bedrooms and an office floor in each hotel module. To develop the project, the current regulations have been taken into account, like the Technical Building Code, the Regulation of Heating Installations in Buildings, the Low Voltage electrotechnical Regulation, the metropolitan and municipal ordinances of Girona, among others. The Project involves 5 parts: - Descriptive plan of each installation - Calculation annex - Tender documentation - Installation Budget - Plans and details of installation
dc.language.isospa
dc.publisherUniversitat Politècnica de Catalunya
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 Spain
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/es/
dc.subjectÀrees temàtiques de la UPC::Arquitectura::Projectes arquitectònics::Projecte executiu d'obra
dc.subjectÀrees temàtiques de la UPC::Edificació::Instal·lacions i acondicionament d’edificis
dc.subject.lcshArchitecture--Designs and plans
dc.subject.lcshBuilding fittings
dc.titleDesarrollo de un proyecto ejecutivo de las instalaciones de un Hotel de 4 estrellas en Girona
dc.typeBachelor thesis
dc.subject.lemacHotels -- Instal·lacions
dc.subject.lemacArquitectura -- Projectes -- Catalunya -- Girona
dc.rights.accessOpen Access
dc.audience.educationlevelGrau
dc.audience.mediatorEscola Politècnica Superior d'Edificació de Barcelona
dc.audience.degreeGRAU EN CIÈNCIES I TECNOLOGIES DE L'EDIFICACIÓ (Pla 2009)


Fitxers d'aquest items

Thumbnail
Thumbnail

Aquest ítem apareix a les col·leccions següents

Mostra el registre d'ítem simple