Dirección de ejecución de obra de 41 viviendas, locales comerciales y aparcamiento
Visualitza/Obre
memoria (334,8Kb) (Accés restringit)
relació documents (30,95Kb) (Accés restringit)
anexe 1 (4,229Mb) (Accés restringit)
anexe 1-2 (6,360Mb) (Accés restringit)
anexe 2 (5,221Mb) (Accés restringit)
anexe 3 (20,40Mb) (Accés restringit)
anexe 4 (8,313Mb) (Accés restringit)
anexe 5 (35,57Mb) (Accés restringit)
anexe 6 (72,68Mb) (Accés restringit)
anexe 7 (119,6Mb) (Accés restringit)
anexe 8 (118,4Mb) (Accés restringit)
anexe 9 (895,1Kb) (Accés restringit)
Estadístiques de LA Referencia / Recolecta
Inclou dades d'ús des de 2022
Cita com:
hdl:2099.1/17158
Tipus de documentTreball Final de Grau
Data2012-01-25
Condicions d'accésAccés restringit per decisió de l'autor
Tots els drets reservats. Aquesta obra està protegida pels drets de propietat intel·lectual i
industrial corresponents. Sense perjudici de les exempcions legals existents, queda prohibida la seva
reproducció, distribució, comunicació pública o transformació sense l'autorització del titular dels drets
Abstract
This Final Degree Work aims to apply the theoretical knowledge acquired during this Engineering Construction Degree (which has come to improve my Technical Architecture studies). Since I finished my Technical Architecture Studies in 1998, the construction world has developed substantially. Obviously there is a temporal evolution of the building work systems, which were improved and updated to fit better the needs that arise, although the significant change relies on the mandatory rules in which the constructive world is based. Those rules govern and determinate the construction work systems as they tend to fix a methodology and set goals to achieve. From the day I started working until nowadays, the evolution suffered by the construction work systems had introduced considerable changes on my professional work, which has obliged me to look for constant formation in this area. This Construction Engineering Degree makes part of this continuous formation as well as it will open the door of the European labor market, because by concluding those studies, I’m gaining more competitive skills and will be able to enter the European market. The main reason of this exposition consists in explaining the work I realized between 2008 and 2009, carrying out the execution of an apartment building located in Rubí, where I needed to apply this complementary formation in conjunction with my university studies. That’s why I chose this topic for this work, because, even being a Technical Architect and driving more than 10 years practicing as such, the best way to demonstrate the knowledge acquired from the practice and continuous formation is showing part of the work I realized. During the construction of this apartment building, apart from finding certain constructive difficulties, which I‘ll explain later, this was the first work on which I had to apply the new mandatory rules, different from the rules I was used to until now, the CTE. About the CTE, as I’ll remark later, it is interesting to note that I had to apply it only in a part of the apartment building.
Fitxers | Descripció | Mida | Format | Visualitza |
---|---|---|---|---|
MEMORIA .pdf | memoria | 334,8Kb | Accés restringit | |
RELACIÓN DE DOC ... CONFORMAN ESTE TRABAJO.pdf | relació documents | 30,95Kb | Accés restringit | |
ANEXO 1 - FASE ... O INICIAL ARQUITECTURA.pdf | anexe 1 | 4,229Mb | Accés restringit | |
ANEXO 1 - FASE ... CTO INICIAL ESTRUCTURA.pdf | anexe 1-2 | 6,360Mb | Accés restringit | |
ANEXO 2 - FASE ... ITECTURA Y ESTRUCTURA).pdf | anexe 2 | 5,221Mb | Accés restringit | |
ANEXO 3 - FASE DE PROYECTO - INGENIERIAS.pdf | anexe 3 | 20,40Mb | Accés restringit | |
ANEXO 4 - FASE ... E REPLANTEO Y DETALLES.pdf | anexe 4 | 8,313Mb | Accés restringit | |
ANEXO 5 - FASE ... N DE EJECUCIÓN DE OBRA.pdf | anexe 5 | 35,57Mb | Accés restringit | |
ANEXO 6 - FASE ... Y SEGUIMIENTO DE OBRA.pdf | anexe 6 | 72,68Mb | Accés restringit | |
ANEXO 7 - FASE DE OBRA - CONTROL DE CALIDAD.pdf | anexe 7 | 119,6Mb | Accés restringit | |
ANEXO 8 - FASE ... CONTROL DE CALIDAD CTE.pdf | anexe 8 | 118,4Mb | Accés restringit | |
ANEXO 9 - FASE DE OBRA - MEDICIONES .pdf | anexe 9 | 895,1Kb | Accés restringit |