Mostra el registre d'ítem simple

dc.contributorMenches, Cindy
dc.contributor.authorDiaz Aguilo, Diana
dc.date.accessioned2010-12-28T12:52:10Z
dc.date.available2010-12-28T12:52:10Z
dc.date.issued2009
dc.identifier.urihttp://hdl.handle.net/2099.1/10691
dc.description.abstractIn 2007, ELECTRI International – The Foundation for Electrical Construction, the research arm of the National Electrical Contractors Association (NECA), funded a research project to develop a model electrical project management process that could be used by NECA members to improve their management practices. The study critically evaluated the relationship between project management and project performance. As part of the research process, in-depth project-specific information was collected on the management effort and project outcome for several “successful” and “less-thansuccessful” projects. This data collection effort culminated in a detailed analysis of the project management practices of these two groups to identify clear differences between “successful” and “less-than-successful” projects. Ultimately, 25 randomly-selected companies from 12 states agreed to participate in an interview for the research project. Data was collected on 50 “successful” and “less-than-successful” projects. The management activities that were performed on the successful projects were used to develop the model Electrical Project Management Process. The model process was fashioned after those projects that performed good management and achieved a successful outcome. As such, the model management process incorporated the best management practices in the electrical construction industry. The management processes of the successful and less-than-successful projects were compared to the model process, and, ultimately, it was discovered that those projects that implemented processes that more closely matched the model resulted in more successful performance.
dc.language.isoeng
dc.publisherUniversitat Politècnica de Catalunya
dc.publisherIllinois Institute of Technology
dc.subjectÀrees temàtiques de la UPC::Enginyeria electrònica
dc.subject.lcshProcess control
dc.subject.lcshElectric engineering
dc.titleElectrical project management implementation manual
dc.typeMaster thesis (pre-Bologna period)
dc.subject.lemacControl de processos
dc.subject.lemacEnginyeria elèctrica -- Projectes
dc.rights.accessRestricted access - author's decision
dc.audience.educationlevelEstudis de primer/segon cicle
dc.audience.mediatorEscola Tècnica Superior d'Enginyeria Industrial de Barcelona
dc.audience.degreeENGINYERIA INDUSTRIAL (Pla 1994)
dc.contributor.covenanteeIllinois Institute of Technology
dc.contributor.covenanteeElectri International
dc.description.mobilityOutgoing


Fitxers d'aquest items

Imatge en miniatura

Aquest ítem apareix a les col·leccions següents

Mostra el registre d'ítem simple