|
E-prints UPC >
Altres >
Enviament des de DRAC >
Empreu aquest identificador per citar o enllaçar aquest ítem:
http://hdl.handle.net/2117/8905
|
| Citació: | Bautista, J.; Suárez, R. Mixed-model sequencing problem with overload minimization considering workstations dependencies. A: IEEE International Symposiumon Assembly and Manufacturing. "ISAM 2009". Suwon: 2009, p. 351-357. |
| Títol: | Mixed-model sequencing problem with overload minimization considering workstations dependencies |
| Autor: | Bautista Valhondo, Joaquín ; Suárez Feijóo, Raúl  |
| Data: | 2009 |
| Tipus de document: | Conference report |
| Resum: | Abstract—This paper reviews the formulation of the Mixed
Model Sequencing Problem with Workload minimization
(MMSP-W). Two significative models already presented in the
literature are describe, showing that they are valid for the case
of parallel workstations, but do not properly solve the case
of serial workstations. After that, a new model is introduced
that is valid for the case of serial workstations. An example
is used to illustrate the performance of all the models, and a
computational experience was done to verify the applicability
of the proposed model using the solver CPLEX and a set
of problem instances of small dimension adapted from the
literature. |
| ISBN: | 978-1-4244-4628-5 |
| URI: | http://hdl.handle.net/2117/8905 |
| Apareix a les col·leccions: | Altres. Enviament des de DRAC Institut d'Organització i Control de Sistemes Industrials. Ponències/Comunicacions de congressos Departament d'Organització d'Empreses. Ponències/Comunicacions de congressos PROMALS - Grup de Recerca en Programació Matemática, Logística i Simulació. Ponències/Comunicacions de congressos SIR - Robòtica Industrial i Servei. Ponències/Comunicacions de congressos
|
| Comparteix: |
|
Aquest ítem (excepte textos i imatges no creats per l'autor) està subjecte a una llicència de Creative Commons Llicència Creative Commons
|