|
E-prints UPC >
Economia i organització d'empreses >
Departament d'Organització d'Empreses >
Working papers >
Empreu aquest identificador per citar o enllaçar aquest ítem:
http://hdl.handle.net/2117/633
|
| Títol: | New computational experiences on the Hoist Scheduling Problem for cyclic manufacturing of different products. |
| Autor: | Mateo Doll, Manuel ; Companys Pascual, Ramón  |
| Data: | gen-2007 |
| Tipus de document: | External research report |
| Citació: | DITS |
| Resum: | Jobs of two products must receive the same treatments in a production
line of tanks. If the size of both batches is equal, we propose a cyclic manufacturing
composed of a job from batch 1 and a job from batch 2. A hoist ensures the transfer of
the jobs between tanks. The problem consists in the scheduling of hoist movements,
which is known as HSP (Hoist Scheduling Problem). There is a comparison between
completely separated and mixed production for both batches. The objective is to
determine a sequence which minimises the cycle time for two jobs from different
products (2-product cycle). We propose a branch-and-bound procedure, which can also
be applied to the 2-cycle case for a single product. The model can be extended to ncycles. |
| URI: | http://hdl.handle.net/2117/633 |
| Apareix a les col·leccions: | Departament d'Organització d'Empreses. Reports de recerca Departament d'Organització d'Empreses. Working papers
|
| Comparteix: |
|
Aquest ítem (excepte textos i imatges no creats per l'autor) està subjecte a una llicència de Creative Commons Llicència Creative Commons
|