|
E-prints UPC >
Economia i organització d'empreses >
EOLI - Enginyeria d´Organització i Logística Industrial >
Articles de revista >
Empreu aquest identificador per citar o enllaçar aquest ítem:
http://hdl.handle.net/2117/6078
|
| Citació: | Andres, C.; Miralles, C.; Pastor, R. "Balancing and scheduling tasks in assembly lines with sequence-dependent setup times". European Journal of Operational Research, 2008, Vol. 187, No. 3, p. 1212-1223. |
| Títol: | Balancing and scheduling tasks in assembly lines with sequence-dependent setup times |
| Autor: | Andrés, Carlos; Miralles, Cristóbal; Pastor Moreno, Rafael  |
| Editorial: | Elsevier |
| Data: | jun-2008 |
| Tipus de document: | Article |
| Resum: | The classical Simple Assembly Line Balancing Problem (SALBP) has been widely enriched over the past few years with many realistic approaches and much effort has been made to reduce the distance between the academic theory and the industrial reality. Despite this effort, the scheduling of the execution of tasks assigned to every workstation following the balancing of the assembly line has been scarcely reported in the scientific literature. This is supposed to be an operational concern that the worker should solve himself, but in several real environments, setups between tasks exist and optimal or near-optimal tasks schedules should be provided inside each workstation. The problem presented in this paper adds sequence-dependent setup time considerations to the classical SALBP in the following way: whenever a task is assigned next to another at the same workstation, a setup time must be added to compute the global workstation time. After formulating a mathematical model for this innovative problem and showing the high combinatorial nature of the problem, eight different heuristic rules and a GRASP algorithm are designed and tested for solving the problem in reasonable computational time. |
| ISSN: | 0377-2217 |
| URI: | http://hdl.handle.net/2117/6078 |
| Versió de l'editor: | http://dx.doi.org/10.1016/j.ejor.2006.07.044 |
| Apareix a les col·leccions: | Institut d'Organització i Control de Sistemes Industrials. Articles de revista EOLI - Enginyeria d´Organització i Logística Industrial. Articles de revista
|
| Comparteix: |
|
Queda prohibida la reproducció, transformació, distribució i comunicació pública d'aquesta obra. Es permet, en tot cas, la reproducció per a ús privat sempre i quan la còpia que se'n faci no sigui objecte d'utilització col·lectiva ni lucrativa (art. 31.2 del Reial Decret Legislatiu 1/1996, de 12 d'abril, pel qual s'aprova el Text Refós de la Llei de Propietat Intel·lectual, http://bibliotecnica.upc.es/sepi/legislacio.asp).
Per a qualsevol ús que es vulgui fer diferent al permès, dirigiu-vos a: sepi@upc.edu
|