| Vista preliminar | Data | Títol | Autor(s) |
| nov-2012 | Prospective and perspective review in integrated supply chain modelling for the chemical process industry | Lainez Aguirre, José Miguel; Puigjaner Corbella, Lluís |
| ago-2012 | Design of regional and sustainable bio-based networks for electricity generation using a multi-objective MILP approach | Pérez Fortes, María del Mar; Lainez Aguirre, José Miguel; Arranz Piera, Pol; Velo García, Enrique; Puigjaner Corbella, Lluís |
| 11-jul-2012 | Ontological framework for enterprise-wide integrated decision-making at operational level | Muñoz, Edrisi; Capón García, Elisabet; Espuña Camarasa, Antonio; Puigjaner Corbella, Lluís |
| jun-2012 | Fault diagnosis of a benchmark fermentation process: a comparative study of feature extraction and classification techniques | Monroy, Isaac; Villez, Kris; Graells Sobré, Moisès; Venkatasubramanian, Venkat |
 | 28-abr-2012 | Identification of volatile organic compounds (VOC) emitted from three European orchid species with different pollination strategies : two deceptive orchids (Himantoglossum robertianum and Ophrys apifera) and a rewarding (Gymnadenia conopsea) | Gallego Piñol, Eva; Gelabert, A.; Roca Mussons, Francisco Javier; Perales, Francisco; Guardino, X. |
| 2012 | Efficient mathematical frameworks for detailed production scheduling in food processing industries | Kopanos, Georgios; Puigjaner Corbella, Lluís; Georgiadis, Michael C. |
| 2012 | Simultaneous production and logistics operations planning in semicontinuous food industries | Kopanos, Georgios; Puigjaner Corbella, Lluís; Georgiadis, Michael C. |
| 14-des-2011 | Resource-constrained production planning in semicontinuous food industries | Kopanos, Georgios; Puigjaner Corbella, Lluís; Georgiadis, Michael C. |
| 5-des-2011 | Enhanced plant fault diagnosis based on the characterization of transient stages | Monroy, Isaac; Benítez Iglesias, Raúl; Escudero Bakx, Gerard; Graells Sobré, Moisès |
| 20-oct-2011 | Simultaneous evaluation of odor episodes and air quality in urban areas by multi-sorbent sampling and TD-GC/MS analysis | Gallego Piñol, Eva; Roca Mussons, Francisco Javier; Perales Lorente, José Francisco; Guardino Solà, Xavier |
| oct-2011 | Multiobjective optimization of multiproduct batch plants scheduling under environmental and economic concerns | Capón García, Elisabet; Bojarski, Aarón David; Espuña Camarasa, Antonio; Puigjaner Corbella, Lluís |
| 10-ago-2011 | Advanced simulation environment for clean power production in IGCC plants | Pérez Fortes, María del Mar; Bojarski, Aarón David; Puigjaner Corbella, Lluís |
| 11-mai-2011 | Scheduling and control decision-making under an integrated information environment | Muñoz Mata, Edrisi; Capón García, Elisabet; Moreno Benito, Marta; Espuña Camarasa, Antonio; Puigjaner Corbella, Lluís |
| 4-mai-2011 | Improved short-term batch scheduling flexibility using variable recipes | Capón García, Elisabet; Moreno Benito, Marta; Espuña Camarasa, Antonio |
| 21-abr-2011 | Comparative study of the adsorption performance of an active multi-sorbent bed tube (Carbotrap, Carbopack X, Carboxen 569) and a Radiello diffusive sampler for the analysis of VOCs | Gallego Piñol, Eva; Roca Mussons, Francisco Javier; Perales Lorente, José Francisco; Guardino, Xavier |
| 10-abr-2011 | Production scheduling in multiproduct multistage semicontinuous food processes | Kopanos, Georgios; Puigjaner Corbella, Lluís; Georgiadis, Michael C. |
 | 2011 | Production planning and scheduling of parallel continuous processes with product families | Kopanos, Georgios; Puigjaner Corbella, Lluís; Maravelias, Christos T. |
| 16-jun-2010 | MIP-based decomposition strategies for large-scale scheduling problems in multiproduct multistage batch plants: A benchmark scheduling problem of the pharmaceutical industry | Kopanos, Georgios; Méndez, Carlos Alberto; Puigjaner Corbella, Lluís |
| jun-2010 | Estudio cinético del aprovechamiento energético de maderas residuales (I) | Reina Hernandez, Joaquin A.; Velo García, Enrique; Puigjaner Corbella, Lluís |
| 23-mar-2010 | Using S-graph to adress uncertaintly in batch plants | Lainez Aguirre, José Miguel; Hegyháti, Máté; Friedler, Ferenc; Puigjaner Corbella, Lluís |
| 25-gen-2010 | Comparative study of the adsorption performance of an active multi-sorbent bed tube (Carbotrap, Carbopack X, Carboxen 569) and a Tenax TA adsorbent tube for the analysis of VOCs | Gallego Piñol, Eva; Roca Mussons, Francisco Javier; Perales Lorente, José Francisco; Guardino, Xavier |
| 25-gen-2010 | Comparative study of the adsorption performance of a multi-sorbent bed (Carbotrap, Carbopack X, Carboxen 569) and a Tenax TA adsorbent tube for the analysis of volatile organic compounds (VOCs) | Gallego Piñol, Eva; Roca Mussons, Francisco Javier; Perales Lorente, José Francisco; Guardino, Xavier |
 | 4-gen-2010 | Towards an ontological infrastructure for chemical batch process management | Espuña Camarasa, Antonio; Puigjaner Corbella, Lluís |
| 4-des-2009 | Optimal production scheduling and lot-sizing in diary plants: the yogurt production line | Kopanos, Georgios; Puigjaner Corbella, Lluís; Georgiadis, Michael C. |
| 1-oct-2009 | Statiscal and simulation tools for designing an optimal blanketing system of a multiple-tank facility | Capón García, Elisabet; Espuña Camarasa, Antonio; Puigjaner Corbella, Lluís |
| 10-ago-2009 | Tracking the Dynamics of the Supply Chain for Enhanced Production Sustainability | Puigjaner Corbella, Lluís; Lainez Aguirre, José Miguel; Álvarez, Carlos Rodrigo |
| 12-mai-2009 | Conceptual model and evaluation of generated power and emissions in an IGCC plant | Pérez Fortes, María del Mar; Bojarski, Aarón David; Velo García, Enrique; Nougués, José María; Puigjaner Corbella, Lluís |
| mai-2009 | Incorporating environmental impacts and regulations in a holistic supply chains modeling: An LCA approach | Bojarski, Aarón David; Lainez Aguirre, José Miguel; Espuña Camarasa, Antonio; Puigjaner Corbella, Lluís |
| 11-mar-2009 | Enchancing abnormal events management by the use of quantitative process hazards analysis results | Yélamos Ruiz, Ignacio; Bojarski, Aarón David; Joglekar, Girish; Venkatasubramanian, Venkat; Puigjaner Corbella, Lluís |
 | 3-mar-2009 | Determining indoor air quality and identifying the origin of odour episodes in indoor environments | Gallego Piñol, Eva; Roca Mussons, Francisco Javier; Perales Lorente, José Francisco; Guardino, Xavier |
| 13-gen-2009 | Performance assessment of a novel fault diagnosis system based on support vector machines | Yélamos Ruiz, Ignacio; Escudero Bakx, Gerard; Graells Sobré, Moisès; Puigjaner Corbella, Lluís |
| 5-gen-2009 | Estimation of Liquid-Liquid Equilibrium for a Quaternary System Using the GMDH Algorithm | Reyhani, Shahbaz Zahr; Ghanadzadeh, Hossein; Puigjaner Corbella, Lluís; Recasens Garcia, Francesc |
| 5-gen-2009 | An extended formulation for the flexible short-term scheduling of multiproduct semicontinuos plants | Capón García, Elisabet; Ferrer Nadal, Sergio; Graells Sobré, Moisès; Puigjaner Corbella, Lluís |
| 19-nov-2008 | Costs for rescheduling actions: a critical issue for reducing the gap between scheduling theory and practice | Kopanos, Georgios; Capón García, Elisabet; Espuña Camarasa, Antonio; Puigjaner Corbella, Lluís |
| 5-nov-2008 | Life cycle assessment coupled with process simulation under uncertauinty for reduced environmental impact: application to phosphoric acid production | Bojarski, Aarón David; Guillén Gosálbez, Gonzalo; Jiménez, Laureano; Espuña Camarasa, Antonio; Puigjaner Corbella, Lluís |
| 22-ago-2008 | Proactive approach to address the uncertainty in short-term scheduling | Bonfill Teixidor, Anna; Espuña Camarasa, Antonio; Puigjaner Corbella, Lluís |
| 8-jun-2008 | Decision support framework for coordinated production and transport scheduling in SCM | Bonfill Teixidor, Anna; Espuña Camarasa, Antonio; Puigjaner Corbella, Lluís |
| 11-abr-2008 | Towards an integrated framework for supply chain management in the batch chemical process industry | Puigjaner Corbella, Lluís; Guillén Gosálbez, Gonzalo |
| 29-gen-2008 | Managing risk through a flexible recipe framework | Ferrer Nadal, Sergio; Puigjaner Corbella, Lluís; Guillén Gosálbez, Gonzalo |
| 23-oct-2006 | Metaheuristic multiobjective optimisation approach for the scheduling of multiproduct batch chemical plants | Arbiza, María José; Bonfill Teixidor, Anna; Guillén Gosálbez, Gonzalo; Mele, Fernando D.; Espuña Camarasa, Antonio; Puigjaner Corbella, Lluís |
 | 1994 | Detailed modeling of upflow anaerobic fixed film reactors | Flotats Ripoll, Xavier; Puigjaner Corbella, Lluís |