| Vista preliminar | Data | Títol | Autor(s) |
 | - | Solving the Fm|block|Cmax problem using bounded dynamic programming | Bautista Valhondo, Joaquín; Cano Pérez, Alberto; Companys Pascual, Ramón; Ribas Vila, Immaculada |
| 16-abr-2013 | A MILP model to design hybrid wind-photovoltaic isolated rural electrification projects in developing countries | Ferrer Martí, Laia; Doménech Lega, Bruno; García Villoria, Alberto; Pastor Moreno, Rafael |
| 2013 | Heuristic indicators for the design of community off-grid electrification systems based on multiple renewable energies | Ranaboldo, Matteo; Ferrer Martí, Laia; García Villoria, Alberto; Pastor Moreno, Rafael |
 | 11-oct-2012 | Planificación estratégica de la capacidad en una empresa del sector limentación | Companys Pascual, Ramón; Ribas Vila, Immaculada; Bautista Valhondo, Joaquín |
| 22-jun-2012 | A branch and bound algorithm for the response time variability problem | García Villoria, Alberto; Corominas Subias, Albert; Delorme, Xavier; Alexandre, Dolgui; Wieslaw, Kubiak; Pastor Moreno, Rafael |
 | 1-abr-2012 | A Delphi study on Technology Enhanced Learning (TEL) applied on Computer Science (CS) skills | Porta, Marcela; Mas Machuca, Marta; Martínez Costa, Carme; Maillet, Katherine |
 | abr-2012 | Strengths and weaknesses of computer science degrees: The perception from European students | Porta, Marcela; Maillet, Katherine; Martínez Costa, Carme; Mas Machuca, Marta |
| 2-mar-2012 | Optimal manufacturing policy in a reverse logistic system with dependent stochastic returns and limited capacities | Benedito Benet, Ernest; Corominas Subias, Albert |
| 31-gen-2012 | Exploring critical success factors of knowledge management projects in the consulting sector | Mas Machuca, Marta; Martínez Costa, Carme |
 | des-2011 | Propuesta de un algoritmo genético para la programación diaria de los pedidos de una empresa del sector de la construcción | Pinto, Carola; Coves Moreno, Anna Maria |
| des-2011 | Codigestion of cow and guinea pig manure in low-cost tubular digesters at high altitude | Garfi, Marianna; Ferrer Martí, Laia; Pérez Bort, Irene; Flotats Ripoll, Xavier; Ferrer Martí, Ivet |
| feb-2011 | Planning working time accounts under demand uncertainty | Lusa García, Amaia; Pastor Moreno, Rafael |
| 2011 | Optimizing microwind rural electrification projects. A case study in Peru | Ferrer Martí, Laia; Pastor Moreno, Rafael; Capó Plaza, Gregori Miquel; Velo García, Enrique |
 | 13-des-2010 | Improving social capital: a social network monitoring system | Monguet Fierro, José María; Ojeda Rodríguez, Jordi; Cadima, Rita; Ferreira, Carlos |
 | 1-jun-2010 | Electromechanical modelling and control of a micro-wind generation system for isolated low power DC micro grids | Colet Subirachs, Alba; Gomis Bellmunt, Oriol; Clos Costa, Daniel; Martín Segura, Guillermo; Junyent Ferré, Adrià; Villafafila Robles, Roberto; Villafafila Robles, Roberto; Ferrer Martí, Laia |
| 1-gen-2010 | A support tool for working time bargaining by considering individual time accounts and annual leave | Pastor Moreno, Rafael; Corominas Subias, Albert; Olivella Nadal, Jordi |
| 1-gen-2010 | A parametric multi-start algorithm for solving the Response Time Variability Problem | Corominas Subias, Albert; García Villoria, Alberto; Pastor Moreno, Rafael |
| 2010 | Optimal manufacturing and remanufacturing capacities of systems with reverse logistics and deterministic uniform demand | Benedito Benet, Ernest; Corominas Subias, Albert |
| 11-des-2009 | Solving the response time variability problem by means of the electromagnetism-like mechanism | García Villoria, Alberto; Pastor Moreno, Rafael |
 | des-2009 | OR for rural electrification projects in developing countries | Ferrer Martí, Laia |
| nov-2009 | Optimization of cold-formed steel pallet racking cross-sections for flexural-torsional buckling with constraints on the geometry | Pastor Artigues, María Magdalena; Casafont Ribera, Miguel; Chillarón Jordán, Eduardo; Lusa García, Amaia; Roure Fernández, Francisco; Somalo Coarasa, María Rosa |
 | set-2009 | How to diagnose equal opportunities between women and men in organizations | Lusa García, Amaia; Martínez Costa, Carme; Calvet Puig, Maria Dolors; Pons Peregort, Olga; Tura Solvas, Marta |
| jul-2009 | Planning production using mathematical programming: The case of a woodturning company | Pastor Moreno, Rafael; Altamiras, Jordi; Mateo Doll, Manuel |
 | 2009 | El paisaje portuario en viñetas | Ojeda Rodríguez, Jordi |
 | des-2008 | Balancing assembly line with skilled and unskilled workers | Corominas Subias, Albert; Pastor Moreno, Rafael; Plans Bartolí, Joan |
 | ago-2008 | Optimal manufacturing-remanufacturing policies in a lean production environment | Rubio, Sergio; Corominas Subias, Albert |
 | jun-2008 | A multistage scenario optimisation procedure to plan annualised working hours under demand uncertainty. | Lusa García, Amaia; Corominas Subias, Albert; Muñoz, Norberto |
 | jun-2008 | Balancing and scheduling tasks in assembly lines with sequence-dependent setup times | Andrés, Carlos; Miralles, Cristóbal; Pastor Moreno, Rafael |
 | abr-2008 | An exact procedure to plan holidays and working time under annualised hours considering cross-trained workers with different efficiencies | Lusa García, Amaia; Corominas Subias, Albert; Pastor Moreno, Rafael |
 | mar-2008 | A variable neighbourhood search algorithm for the constrained task allocation problem | Lusa García, Amaia; Potts, Chris N. |
 | feb-2008 | Determining the most appropriate set of weekly working hours for planning annualised working time | Lusa García, Amaia; Pastor Moreno, Rafael; Corominas Subias, Albert |
 | gen-2008 | Selecting and adapting weekly work schedules with working time accounts: a case of a retail clothing chain | Pastor Moreno, Rafael; Olivella Nadal, Jordi |
 | gen-2008 | A survey of the literature on the multiple or parallel assembly Line balancing problem | Lusa García, Amaia |
 | nov-2007 | Planning production and working time within an annualised hours scheme framework | Corominas Subias, Albert; Lusa García, Amaia; Pastor Moreno, Rafael |
 | 15-set-2007 | An experiment on task performance forecasting based on the experience of different tasks | Olivella Nadal, Jordi |
 | ago-2007 | Evaluating optimization models to solve SALBP | Pastor Moreno, Rafael; Ferrer Martí, Laia; García Villoria, Alberto |
 | jun-2007 | Gestión de los horarios de trabajo en presencia de cláusulas de flexibilidad pasiva. | Lusa García, Amaia; Martínez Costa, Carme; Olivella Nadal, Jordi |
 | mar-2007 | Using a MILP model to establish a framework for an annualised hours agreement | Corominas Subias, Albert; Lusa García, Amaia; Pastor Moreno, Rafael |
 | gen-2007 | Planning annualised hours with a finite set of weekly working hours and cross-trained workers. | Corominas Subias, Albert; Lusa García, Amaia; Pastor Moreno, Rafael |
 | gen-2007 | Semi-Dynamic Demand in a Non-Permutation Flowshop with Constrained Resequencing Buffers. | Färber, Gerrit Hartmut; Salhi, Said; Coves Moreno, Anna Maria |
 | oct-2006 | Solving the Response Time Variability Problem by means of metaheuristics | García Villoria, Alberto; Pastor Moreno, Rafael; Corominas Subias, Albert |
 | 15-set-2006 | A contribution towards a methodology for managing learning, multi-skilling and performance on the shop floor | Olivella Nadal, Jordi |
 | set-2006 | Rotational allocation of tasks to multifunctional workers in a service industry | Corominas Subias, Albert; Pastor Moreno, Rafael; Rodríguez, Ericka |
 | mai-2006 | The ASALB problem with processing alternatives involving different tasks: definition, formalization and resolution | Capacho Betancourt, Liliana; Pastor Moreno, Rafael |
 | abr-2006 | Solving the minmax product rate variation problem (PRVP) as a bottleneck assignment problem | Moreno Palli, Natalia; Corominas Subias, Albert |
 | mar-2006 | Stabilizing work schedules in a call centre: expected and unexpected results | Olivella Nadal, Jordi; Pastor Moreno, Rafael |
 | jun-2005 | Multi-objective allocation of multi-function workers with lower bounded capacity | Corominas Subias, Albert; Ojeda Rodríguez, Jordi; Pastor Moreno, Rafael |
 | mar-2005 | Annualised Hours: A Real Flexibility Tool | Corominas Subias, Albert; Lusa García, Amaia; Pastor Moreno, Rafael |
 | des-2004 | Characteristics and classification of the annualised workings hours planning problems | Corominas Subias, Albert; Lusa García, Amaia; Pastor Moreno, Rafael |
 | set-2004 | Modelado del llenado de vehículo con cargas de distintos tamaños mediante programación matemática entera | Ferrer Martí, Laia; Santos López, M. Antonia de los; Coves Moreno, Anna Maria |
 | set-2004 | Modelado del transporte de distribución mediante programación lineal entera | Ferrer Martí, Laia; Santos López, M. Antonia de los; Coves Moreno, Anna Maria |
 | jun-2004 | Branch and Win: OR tree search algorithms for solving combinatorial optimisation problems | Pastor Moreno, Rafael; Corominas Subias, Albert |
 | 30-abr-2004 | Planning annualised hours with a finite set of weekly working hours and joint holidays | Corominas Subias, Albert; Lusa García, Amaia; Pastor Moreno, Rafael |
 | feb-2002 | A remark about "A comment on consecutive-2-out-of-n systems" | Corominas Subias, Albert |
 | abr-2001 | Solving the generalized apportionment problem through the optimization of discrepancy functions | Bautista Valhondo, Joaquín; Companys Pascual, Ramón; Corominas Subias, Albert |