Exploració per tema "constructive process"
Ara es mostren els items 1-1 de 1
-
Building a high-speed railway station in Girona
(Civil-Comp Press, 2012)
Text en actes de congrés
Accés restringit per política de l'editorialThe high-speed railway station in Girona (Spain) is a diaphragm wall enclosure of approximately 600 meters long, 55 meters wide and an excavated depth of 25 meters. In the cross section there is a bus station, two floors ...