• Liquefaction potential of hydraulic fills 

      Alonso Pérez de Agreda, Eduardo; Gens Solé, Antonio; Tarrago, Dani; Madrid, Ricardo (IOS Press, 2009)
      Text en actes de congrés
      Accés restringit per política de l'editorial
      A container terminal is under construction at the Port of Barcelona. The quay, 1.6 km long, is made of concrete caissons founded on granular rubble mounds. The natural soil is a sequence of normally consolidated fine-grained ...
    • Preload improvement and monitoring in a newly reclaimed area 

      Tarrago, Dani; Deu, Amadeu; Gens Solé, Antonio; Alonso Pérez de Agreda, Eduardo; Griell, R. (Research Publishing, 2012)
      Text en actes de congrés
      Accés restringit per política de l'editorial
      The paper describes the preload improvement of a newly reclaimed area that is part of the current development of the Barcelona Port. The area will provide the required surface of a new container terminal with a berth length ...