| Vista preliminar | Data | Títol | Autor(s) |
 | 6-jul-2009 | A combined inventory routing and game theory approach for a real-world distribution problem | Mateo Doll, Manuel; Aghezzaf, El-Houssaine; Vinyes Vila, Pau |
| 2012 | An algorithm for a biobjective parallel machine problem with eligibility and release and delivery times | Mateo Doll, Manuel; Teghem, Jacques |
 | 2010 | An exact algorithm for the single-vehicle cyclic inventory routing problem | Aghezzaf, El-Houssaine; Zhong, Yiqing; Raa, Birger; Mateo Doll, Manuel |
 | 1-mar-2005 | Aplicación del algoritmo lompen a los problemas Fm | prmu | Cmac y Fm | block | Cmax | Companys Pascual, Ramón; Mateo Doll, Manuel; Alemán, A. |
 | 2010 | A simulation-based approach for solving the flowshop problem | Juan Pérez, Angel Alejandro; Ruíz, Rubén; Lourenço, Helena R.; Mateo Doll, Manuel; Ionescu, Dragos |
| 30-mai-2010 | Assignment process of the emergency services in the E-Call project | Gallegos Díez, David; Liesa Mestres, Francisco; Mateo Doll, Manuel |
 | 2012 | Combinando randomización sesgada y búsqueda local iterativa para resolver problemas de flow-shop | Lourenço, Helena R.; Mateo Doll, Manuel; Grasas, Alex; Agustín Martín, Alba; Juan Pérez, Angel Alejandro |
 | 2012 | Creación de celdas cooperativas en un grupo de tiendas de una misma franquicia | Mateo Doll, Manuel; Torre Martínez, María del Rocío de la; d'Armas, Mayra |
| 2009 | Determinación de las rutas de un robot transportador en un sistema productivo | Mateo Doll, Manuel; D'Armas, Mayra; Santos López, M. Antonia de los |
 | mai-2010 | Ergomomics as basis for a decision support system in the printing industry | Mateo Doll, Manuel; Álvarez Casado, Enrique; Rodríguez Mondelo, Pedro Manuel; Tarral, Marc |
 | 29-feb-2012 | ILS-ESP: An efficient, simple, and parameter-free algorithm for solving the permutation flow-shop problem | Juan, Angel A.; Ramalhinho-Lourenço, Helena; Mateo Doll, Manuel; Castellà, Quim; Barrios, Barry B. |
| 1-des-2010 | Improvement tools for NEH based heuristics on permutation and blocking flow shop scheduling problems | Companys Pascual, Ramón; Ribas Vila, Immaculada; Mateo Doll, Manuel |
| 19-set-2009 | Improvement tools for NEH based heuristics on permutation and blocking flow-shop scheduling problems | Companys Pascual, Ramón; Ribas Vila, Immaculada; Mateo Doll, Manuel |
 | 27-jul-2012 | n-Cyclic Hoist Scheduling Problem to manufacture more than 2 products | Mateo Doll, Manuel; Companys Pascual, Ramón |
 | gen-2007 | New computational experiences on the Hoist Scheduling Problem for cyclic manufacturing of different products. | Mateo Doll, Manuel; Companys Pascual, Ramón |
| 2010 | Note on the behaviour of an improvement heuristic on permutation and blocking flow-shop scheduling | Companys Pascual, Ramón; Ribas Vila, Immaculada; Mateo Doll, Manuel |
| jul-2009 | Planning production using mathematical programming: The case of a woodturning company | Pastor Moreno, Rafael; Altamiras, Jordi; Mateo Doll, Manuel |
| 2011 | Programación de pedidos en un taller con máquinas en paralelo y tiempo de preparación | Mateo Doll, Manuel; D'Armas, Mayra |
| 2010 | Propuesta de procedimientos para mejorar los resultados obtenidos por la heurística NEH en el problema flow shop con bloqueos | Companys Pascual, Ramón; Ribas Vila, Immaculada; Mateo Doll, Manuel |
 | 2012 | Strategic capacity planning in KIOs: a classification scheme | Martínez Costa, Carme; Lusa García, Amaia; Mas Machuca, Marta; Torre Martínez, María del Rocío de la; Mateo Doll, Manuel |