DSpace DSpace UPC
 Català   Castellano   English  

E-prints UPC >

Llistant per Autor Alfaro Pozo, Rocío

Saltar a: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
O introdueix les primeres lletres:   
Ordenar per: En ordre: Resultats/Pàgina Autors/Registre:
Mostrant resultats 1 a 15 de 15
Vista preliminarDataTítolAutor(s)
2011A bounded dynamic programming algorithm for the MMSP-W considering workstation dependencies and unrestricted interruption of the operationsBautista Valhondo, Joaquín; Cano Pérez, Alberto; Alfaro Pozo, Rocío
Artículo Mobbing PROTHIUS.pdf.jpg14-jul-2014Acoso Laboral: Un análisis normativo y jurisprudencialLlovera Laborda, Sara; Alfaro Pozo, Rocío; Bautista Valhondo, Joaquín
MAEB2013.pdf.jpg2013Algoritmos GRASP para solucionar el problema Blocking Flow ShopBautista Valhondo, Joaquín; Cano Pérez, Alberto; Alfaro Pozo, Rocío; Batalla García, Cristina
20140710_Poster_TSALBP_MIN_R.pdf.jpg2014Ergonomic risk minimisation in assembly line balancingBautista Valhondo, Joaquín; Batalla García, Cristina; Alfaro Pozo, Rocío
TSALBP-ergo-MIM2013(1).pdf.jpg2013Extended models for TSALBP with ergonomic risk constraintsBautista Valhondo, Joaquín; Batalla García, Cristina; Alfaro Pozo, Rocío; Cano Pérez, Alberto
732.pdf.jpg2013Hybrid procedure based on Bounded Dynamic Programming and Linear Programming for solving a variant of the MMSP-WBautista Valhondo, Joaquín; Cano Pérez, Alberto; Alfaro Pozo, Rocío; Batalla García, Cristina
cio2012-regularidadMMSPW.PDF.jpg2012Incorporando regularidad del trabajo requerido al MMSP con mínima sobrecarga.Bautista Valhondo, Joaquín; Cano Pérez, Alberto; Alfaro Pozo, Rocío
ERGO-TSALBP-APMS2012.pdf.jpg2012Incorporating ergonomics factors into the TSALBPBautista Valhondo, Joaquín; Batalla García, Cristina; Alfaro Pozo, Rocío
incorporating.pdf.jpg2012Incorporating regularity of required workload to the MMSP-W with serial workstations and free interrumption of the operationsBautista Valhondo, Joaquín; Alfaro Pozo, Rocío; Cano Pérez, Alberto
WP_Work_Pace_MMSP_2014.pdf.jpg13-nov-2014Incorporating working conditions to a mixed- model sequencing problemBautista Valhondo, Joaquín; Alfaro Pozo, Rocío; Llovera Laborda, Sara; Batalla García, Cristina
cio2012-modelingMMSPW.PDF.jpg2012Modeling and solving a variant of MMSP-W problem with production mix restrictions.Bautista Valhondo, Joaquín; Cano Pérez, Alberto; Alfaro Pozo, Rocío
15-set-2012Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints. An application in Nissan’s Barcelona PlantBautista Valhondo, Joaquín; Cano Pérez, Alberto; Alfaro Pozo, Rocío
Solving the Mixed Model Sequencing.pdf.jpg2013Solving the mixed model sequencing problem with workload minimization with product mix preservationBautista Valhondo, Joaquín; Cano Pérez, Alberto; Alfaro Pozo, Rocío; Batalla García, Cristina
cio2012-ORVP.PDF.jpg2012Solving the ORVP with preservation of the production mix using BDP.Bautista Valhondo, Joaquín; Alfaro Pozo, Rocío; Cano Pérez, Alberto
Jornada_Sector_automocion.pdf.jpg13-oct-2014Tiempo efectivo de trabajo: Un análisis normativo de la jornada laboral en el sector de automociónLlovera Laborda, Sara; Bautista Valhondo, Joaquín; Llovera Sáez, Francisco Javier; Alfaro Pozo, Rocío
Mostrant resultats 1 a 15 de 15

 

Valid XHTML 1.0! Programari DSpace Copyright © 2002-2004 MIT and Hewlett-Packard Comentaris
Universitat Politècnica de Catalunya. Servei de Biblioteques, Publicacions i Arxius