• Liquefaction potential of hydraulic fills 

    Alonso Pérez de Agreda, Eduardo; Gens Solé, Antonio; Tarrago, Dani; Madrid, Ricardo (IOS Press, 2009)
    Text en actes de congrés
    Accés restringit per política de l'editorial
    A container terminal is under construction at the Port of Barcelona. The quay, 1.6 km long, is made of concrete caissons founded on granular rubble mounds. The natural soil is a sequence of normally consolidated fine-grained ...